Call Before You Dig

Call Before You DigBrunswick Pipeline’s facilities and pipelines are marked with signs at road, rail and river crossings. Please take note of the signs in your area.
 
Brunswick Pipeline approvals are required for construction and excavation activities on or near our right-of-way in accordance with legislation.

Brunswick Pipeline1-888-410-2220 (outside of Saint John, NB)

Saint John Dig Line1-866-344-5463 (within Saint John, NB)

Brunswick Pipeline would like to hear from you in advance if you are planning work which involves any of the following activities in the vicinity of our pipeline system:

  • Working within 30 metres of our Easement
  • Forestry cutting and removal
  • Excavating or blasting
  • Construction involving heavy machinery near our Easement
  • Development proposal
  • Planning to cross our easement with heavy equipment
  • Road, rail and service crossings of the Easement
  • Paving or changing in existing grades
  • Highway and road reconstruction
  • Fence installation
  • Field tile installations
  • Any other similar activities

If you are in doubt about possible pipeline locations or permissible uses of the Easement, call the Operations office at least 48 hours (two full working days) prior to commencing your work. We will tell you where the pipeline and related facilities are, and will provide you with the written permissions you require to proceed. You must call before you dig.